Muhazrin Petroleum Sdn. Bhd provides Project Management, Training, Education and Engineering Services to the Onshore and Offshore Oil and Gas pipeline Industries.

PIPELINE PROJECT EXPERIENCE - MUHAZRIN HOLDINGS / PETROLEUM SDN. BHD.

OFFSHORE
CLIENT OPERATOR PROJECT TITLE LOCATION SCOPE OF WORK (KEY WORDS) PERIOD
COENS Energy Co., South Korea Daewoo International Corp. Shwe Field Development Project Offshore Myanmar Supply of personnel (Lead Pipeline Engineer) to COENS Energy Co. of South Korea for the Shwe Development Project. 2012
Ombak Marine Sdn. Bhd. Petronas Carigali Sdn. Bhd. Detailed Design of Installation of Gas Lift Line from Rasau to Asam Paya. Miri, Sarawak - South China Seas. Design review of Pipeline from Rasau to Asam Paya. Project involves both Brunei and Malaysia side. 2012
SGS Vietnam PetroVietnam Gas Corporation Nam Con Son 2 Offshore Pipeline Vung Tau, Vietnam Supply of personnel (Lead Pipeline Engineer) to PetroVietnam Gas Corp (via SGS Vietnam) to supervise FEED project for Nam Con Son 2 offshore Pipeline Project. 2011
Ombak Marine Sdn. Bhd. Petronas Carigali Sdn. Bhd. Design Review and Endorsement Miri, Sarawak - South China Seas. Review and endorsed Bollard Pull Analysis, A-Frame Design (usimng CATIA software) and Seafaring Vessel Stability Analysis (using MOSES software). 2010
Ombak Marine Sdn. Bhd. Petronas Carigali Sdn. Bhd. Post trenching of in service West Lutong Pipeline Miri, Sarawak - South China Seas. Perform post trenching analysis of in-service West Lutong Pipeline. Using autoPIPE software. 2010
Ranhill WorleyParsons Sdn. Bhd. Khafji Joint Operations, Saudi Arabia. KJO SO-15 Kuwait/Saudi Border - Persian Gulf Review of Saudi Aramco Offshore Pipeline Standards. 2010
Ranhill WorleyParsons Sdn. Bhd. Zakum Development Co., Abu Dhabi Satah Full Field Development Project (FEED stage) UAE - Persian Gulf. FEED Design of 8 subsea pipelines and 5 subsea cables. Total pipeline length = 190km. This is inclusive of 3 trunklines (57km each). Sizes range from 10" to 24". 2010
SAAG Infrastructure Sdn. Bhd. Ministry of Energy, Green Technology and Water Subsea Pipeline Installation For Labuan Water Supply Labuan, Malaysia - South China Seas Performed pipelaying analysis for the SAAG'as proprietery O-lay method using ABAQUS softwaare. 2010
ETC-CP (M) Sdn. Bhd. India (Confidential) Wellhead Platform Project Offshore India Performed design check for riser anode design and pressure vessel anode design. 2010
Ombak Marine Sdn. Bhd. Ministry of Energy, Green Technology and Water Subsea Pipeline Installation For Labuan Water Supply Labuan, Malaysia - South China Seas Offshore pipeline installation analysis of 26" Spiral Welded Pipeline using Offpipe Software and MathCAD. 2009
Sage Interactive Sdn. Bhd. Petronas E-Learning Pipeline Engineering E-Learning Material Kuala Lumpur Preparation of Oil and Gas Pipeline E-learning materials for Petronas Carigali online learning usage. 2008
LAND
CLIENT OPERATOR PROJECT TITLE LOCATION SCOPE OF WORK (KEY WORDS) PERIOD
Technip Thailand PTTEP Ltd. S2 Field Development Bangkok Thailand Supply of personnel (Lead Pipeline Engineer) to Technip Thailand for the Detailed Design of S2 Field Development Project. 2011
Ranhill WorleyParsons Sdn. Bhd. Conoco Philips Indonesia Suban Phase 2 Detailed Design Sumatra, Indonesia Detailed Pipeline Stress analysis using AutoPIPE software for 1 onshore pipeline. Also performed Finite Element Analysis using ABAQUS software for 3 onshore pipelines. Pipelines are Hight Temperature and High Pressure. 2010
Ranhill WorleyParsons Sdn. Bhd. Petronas Carigali Kumang Cluster Development Project Bintulu, Sarawak - South China Seas. Wall thickness calculation for 28" onshore pipeline. The material grade was reduced from API 5L X-70 to X-65 as requested by PCSB 2010


< BACK TO MAIN